projects
Olympic Stadium (Stratford, London)
Contractor: Sir Robert McAlpine for Team Stadium
Client: Olympic Delivery Authority
Value: Confidential
S. Lucas has started the main decorations package for the
London 2012 Olympic Stadium on the Olympic Park in East
London.
The decorations programme is scheduled to take 35 weeks and
includes the application of decorative and special
protective finishes to walls, ceilings, floors and
staircases to all front and back of house areas throughout
the stadium and to the podium level that surrounds the
stadium.
S. Lucas will be using its innovative brush and roller
washout stations for the project. The environmentally-
friendly process has been developed in conjunction with ICI
Dulux whereby waste paint is turned into an inert "biscuit"
material that can then be disposed of safely.
The contract has been awarded by Sir Robert McAlpine, part
of Team Stadium, which is building the Olympic Stadium for
the Olympic Delivery Authority.
|